PRODUCT PROTECTION
ESD & Moisture Controls
Specify ESD-safe packing, moisture barrier bags and desiccants where the component or assembly requires them.
Customer receives: agreed packing requirements and package identification.
Keep technical decisions, supply-chain actions and delivery records aligned throughout your project. Continue engineering communication through troubleshooting and agreed after-sales actions.
Engineering, group-company manufacturing and specialist partner support are coordinated to the agreed project scope.
01 / Project Control & Coordination
A shared milestone plan helps engineering, procurement and manufacturing work from the same approved information.
Clarify scope, interfaces, quantities, target dates and acceptance criteria.
Output: reviewed RFQ and open-question list.
Agree milestones, dependencies and a Gantt-style schedule where needed; use risk/FMEA review when included.
Output: project schedule, owners and risk actions.
Coordinate design reviews and approved ECR/ECO/ECN changes with document revisions.
Output: approved drawings, change records and baseline.
Report progress, blockers and decisions; confirm release requirements before the next milestone.
Output: milestone report and action/approval log.
02 / Project Control & Coordination
Define sourcing controls with the customer and selected suppliers; the checks below are scoped to the order rather than assumed to apply automatically.
| Control area | Technical review | Project record |
|---|---|---|
| BOM / AVL | Review manufacturer part numbers (MPNs), approved vendors and procurement constraints. | Approved BOM and approved-vendor requirements. |
| Supplier qualification | Agree supplier selection and evidence needed for the product category. | Supplier review and agreed source list. |
| Date code / lot control | Define acceptable date codes, packaging, storage and lot requirements. | Purchase requirements and receipt records. |
| EOL / obsolescence | Review lifecycle changes, alternatives and form/fit/function implications. | Customer-approved substitution or change record. |
| Lead-time & authenticity risk | Assess supply risk and agree counterfeit-mitigation evidence or checks. | Risk review and procurement actions. |
03 / Project Control & Coordination
The document package is agreed at RFQ. Do not assume every report or QMS process is available for every supplier or product.
| Document / process | Purpose | Availability |
|---|---|---|
| QMS / ITP | Quality-management requirements and an inspection/test plan. | Confirm provider, scope and required evidence. |
| FAI / CoC | First-article inspection and certificate of conformity where agreed. | Confirm format, responsibility and acceptance criteria. |
| NCR / disposition | Record nonconforming material or product and the approved action. | Include when agreed in the quality plan. |
| RCA / CAPA / 8D | Root-cause analysis and corrective/preventive action documentation. | Confirm investigation scope and report commitments. |
| Batch traceability | Connect delivered products to the agreed lot and test records. | Define traceability depth and retention requirements. |
04 / Project Control & Coordination
Select packaging and documentation around product sensitivity, destination and agreed responsibilities.
PRODUCT PROTECTION
Specify ESD-safe packing, moisture barrier bags and desiccants where the component or assembly requires them.
Customer receives: agreed packing requirements and package identification.
TRANSPORT
Review shock protection, cushioning, handling and export-packing requirements for the shipment.
Customer receives: packing details and logistics coordination.
DOCUMENTATION
Confirm shipping documents, tracking and commercial delivery responsibilities. Refer to Incoterms 2020 only when agreed in the order.
Customer receives: the agreed shipping-document set and shipment updates.
05 / Project Control & Coordination
Troubleshooting, investigation and repair/replacement decisions follow the agreed order and support terms.
Provide serial/lot references, symptoms, operating conditions, photos and available test logs.
Output: issue record and initial evidence review.
Agree immediate actions, troubleshooting and failure-analysis scope; use 5 Whys or 8D methods where appropriate.
Output: investigation findings and recommended action.
Review return/RMA arrangements and repair, replacement or corrective action according to agreed terms.
Output: approved disposition and responsibilities.
Review corrective-action evidence and confirm the closure decision with the customer.
Output: closure report and revision actions where needed.
Response times, warranty coverage, return authorization and costs are governed by the agreed project or order terms.
06 / Project Control & Coordination
The final package is agreed at quotation and controlled by the approved project revision.
Start the technical discussion
Share your project stage, part or order reference, current issue and the drawings, test results or delivery details needed for review.
We have received your message. Please keep this chat open while we connect you.
We sent a one-time code to your email so you can continue securely.
Enter your email and we will send a one-time code to load your saved conversation.
Check your email for the verification code.